LLC «Interenergo» has experience in implementation of the multipurpose projects, including design, supply and manufacture of the main and auxiliary boiler equipment for the following facilities:

  • Novourengoysky Gas Chemical Combine: implementation of the EPC project
    Supply and manufacture of the main and auxiliary boiler equipment, including the waste heat boilers for 120 MW CCGT unit with bypass pipes, construction and installation works, supervision and commissioning.
  • Yuzhno-Sakhalinskaya Thermal Power Station-1: implementation of the EPC project
    Packaged supply of the main and auxiliary boiler equipment, supply and installation of three waste heat boilers КУВ 50-150 for operation behind the gas turbines manufactured by GE LM6000PF Sprint with the bypass system, construction and installation works, installation supervision and commissioning.
  • Verkhnetagilskaya GRES Power Plant
    Packaged supply, installation and adjustment supervision of the waste heat boiler for power generating unit No. 12 (420 MW CCGT unit).